
Education from a Manufacturing Perspective: A Prek-12 Education Strategy - Paperback
Pay over time for orders over $35.00 with
Edsel Shejen went to trade school and spent thirty-six years in manufacturing.
Four metrics were drilled into his head: Safety, quality, schedule, and cost. The mantra was to safely produce a quality product-on time and at the lowest cost.
After these metrics were established, the departments within the shop used established problem-solving systems such as lean manufacturing, Deming principles,...
Edsel Shejen is a retired machinist from the Portsmouth Naval Shipyard with more than thirty years of manufacturing experience. He was also a coach for more than twelve years.
Contributor(s)
Author
Free shipping on orders over $75. Standard shipping takes 3-7 business days. Returns accepted within 30 days of purchase.
